Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Al Shawa, B (2021) Achieving the climate change targets for the global buildings sector: a techno-socioeconomic pathway, Unpublished PhD Thesis, , University of Bath.

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece, Unpublished PhD Thesis, , University of Bath.

Cusack, M M (1981) Time cost models: their use in decision making in the construction industry, with particular reference to the use of the microcomputer, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Du, Q (2009) Integrated decision-making in the cladding supply chain, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Dulaimi, M F (1991) Job behaviour of site managers: Its determinants and assessment, Unpublished PhD Thesis, , University of Bath.

Gale, A W (1994) Women in construction: An investigation into some of the aspects of image and knowledge as determinants of the under representation of women in construction management in the British construction industry, Unpublished PhD Thesis, , University of Bath.

Grist, E (2014) The implementation of innovative and sustainable construction materials, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Hampshire, P (2015) The development of an approach and decision support tool to inform sustainable roof selection, Unpublished PhD Thesis, School of Management, University of Bath.

Huang, X (2012) Estimating the cost of engineering services using parametrics and the bathtub failure model, Unpublished PhD Thesis, Department of Mechanical Engineering, University of Bath.

Hudson, R (2010) Strategies for parametric design in architecture: an application of practice-led research, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Jirojanakul, P (2000) The quality of life of construction workers' children in Bangkok Metropolis, Thailand, Unpublished PhD Thesis, , University of Bath.

Jobe, K (2017) A flexible housing approach for self-help housing in Botswana, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Joyce, S (2016) Performance driven design systems in practice, Unpublished PhD Thesis, , University of Bath.

Kunieda, Y (2017) Development of an impact assessment tool for demolition, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions, Unpublished PhD Thesis, , University of Bath.

Meese, N (2012) Knowledge sharing for sustainable development: a mixed-method study of an international civil engineering consultancy, Unpublished PhD Thesis, , University of Bath.

Mitchell, R (2020) The performance gap in new construction: evaluation of UK Passivhaus dwellings, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Mustapha, F H (1990) Who are the effective construction site managers and what skills do they bring to their work?, Unpublished PhD Thesis, , University of Bath.

Nisbet, P (1995) Dualism, flexibility and self-employment in the UK construction industry, Unpublished PhD Thesis, , University of Bath.

Orr, J (2012) Flexible formwork for concrete structures, Unpublished PhD Thesis, , University of Bath.

Osaily, Y (2021) Guidance for advancing demolition project management in the UK, Unpublished PhD Thesis, , University of Bath.

Powell, R (2012) Evaluating cognitive screening as a possible solution to reducing accidents and improving workplace productivity through early preventive detection of fatigue-impairment in the construction industry, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.

Root, D S (2001) The influence of professional and occupational cultures on project relationships mediated through standard forms and conditions of contract, Unpublished PhD Thesis, , University of Bath.

Smith, S (2003) Life cycle assessment of civil engineering projects, Unpublished PhD Thesis, , University of Bath.

Voyatzaki, M G (1996) An insight into the design process of unconventional structures, Unpublished PhD Thesis, , University of Bath.

  • Type: Thesis
  • Keywords: communication; problem solving; case study; simulation; architect; designer; interview
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304309462
  • Abstract:
    This thesis studies the design process of unconventional structures starting with the hypotheses that it is different from and more difficult than that of conventional structures. Nine unconventional structures provide case studies for the exploration of the design process. Interviews were carried out with architects and engineers who participated in the design of each case study. The interviews form a historical record of the views of leading designers, some of whom have dominated the field over the last thirty years. The interviews show that difficulties lie in the nature of tasks and timing of the intervention of each discipline, in the specific knowledge of technical issues, in the degree of experience of individuals in the field of unconventional structures, in the different degree of familiarity that individuals have with means of communication and simulation and in the new architectural language of forms. These conclusions were tested against further research based on a study of the literature describing three further case studies and interviews with four leading designers. The outcome of this work confirmed that the design process of conventional and unconventional structures is an intuitive, cyclic problem-solving task which involves the modification of preconceived models in order to arrive at a solution. This process functions and follows the same pattern of iteration and testing of ideas by error elimination irrespective of the conventional or unconventional nature of the outcome. Thus the design process of conventional and unconventional structures is essentially the same, refuting the first hypothesis, but the design of unconventional structures involves a greater number of iterations to eradicate difficulties. In architecture tests are largely qualitative. In engineering they are more quantitative and when designing an unconventional structure it is necessary to invent not only the solution but also the test.

Watson, N (2016) Developing material selection strategies to improve the embodied impacts of buildings, Unpublished PhD Thesis, , University of Bath.

Yin, X (2018) Development of straw bale building in northern China, Unpublished PhD Thesis, , University of Bath.

Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.